Uitvoeren risicoanalyse op elektrische installatie bij Mecam

2015
Leenders, Tim
Professionele bachelor in de elektromechanica

Abstract :
Titel:
Uitvoeren risicoanalyse op elektrische installatie bij Mecam

Auteur:
Tim Leenders

Promotoren:
Ing. Charlie Geerts MECAM
Ing. Ilona Stouten Hogeschool PXL

Het onderwerp van deze bachelorproef is een risicoanalyse op een elektrische installatie. Met behulp van deze analyse wordt de installatie getoetst aan de regels van het Algemeen Reglement op Elektrische Installaties. De analyse wordt uitgevoerd op de elektrische installatie van Mecam te Dilsen-Stokkem. Mecam is een meubelbedrijf waar voornamelijk zitbanken geproduceerd worden. Het bedrijf bestaat 37 jaar en dus is er te maken met een verouderde elektrische installatie. Hierbij is het verplicht een risicoanalyse uit te voeren.

De onderzoeksvraag bestaat uit het controleren van hoe conform de installatie is met de wet (AREI). Vervolgens is de doelstelling van deze bachelorproef om de installatie dan volledig conform met de wet te maken en ook alle elektrische risico’s te verwijderen.

Ieder bedrijf hoort jaarlijks een elektrische keuring te laten uitvoeren, zo ook voor Mecam. Nadat de keuring gebeurd was, zijn er een aantal inbreuken en nota’s vastgesteld. Deze inbreuken en nota’s zorgen voor elektrische gevaren zoals elektrocutie en moeten aangepast worden.

Vervolgens is het, volgens het koninklijk besluit op artikel 104 van 4 december 2012, verplicht een risicoanalyse uit te voeren op verouderde elektrische installaties. Door deze analyse uit te voeren, zullen de inbreuken en nota’s hieruit voortkomen alsook andere problemen die niet overeenkomen met het AREI.

Uit de risicoanalyse komt een actieplan voort. Dit actieplan is een samenvatting van alle problemen van de elektrische installatie. Voor deze problemen worden dan maatregelen gezocht. Daarna worden deze maatregelen besproken en toegepast.

Door de gevonden maatregelen in te voeren, worden de elektrische risico’s weggewerkt. Ook de inbreuken en nota’s van de elektrische keuring worden door deze maatregelen aangepakt. Zo wordt de installatie aangepast en wordt deze conform met de wet.



The subject of this bachelor thesis is a risk analysis of an electrical installation. Using this analysis, the system is tested against the rules of the General Regulations for Electrical Installations. The analysis is performed on the electrical installation of Mecam at Dilsen-Stokkem. Mecam is a furniture company that mainly produces couches. The company exists for 37 years and therefore there is being dealt with an outdated electrical system. Herewith, it is obligated to perform a risk analysis

The research question consists of checking the conformity of the installation with the law (GREI). Subsequently, the objective of this bachelor project is to make the installation fully compliant with the law and also to remove all electrical risks.

Every company should annually carry out an electrical inspection, the same for Mecam. After the inspection was done, there are a fixed number of infringements and notes. These infringements and notes provide electrical hazards such as electrocution and must be adjusted.

Subsequently, according to the Royal Decree on Article 104 of December 4, 2012, it is required to perform a risk analysis on outdated electrical installations. By carrying out this analysis, the infringements and notes will originate from this analysis and also other problems that do not match the GREI.

The risk analysis will produce an action plan. This action plan is a summary of all the problems of the electrical installation. For these problems, measures will be searched. Next these measures are discussed and applied.

By applying the found measures, the electrical hazards are eliminated. The infringements and notes from the electrical inspection are also addressed by these measures. Hereby the electrical installation is adjusted and is in conformity with the law.


Full text:
File Size Type Checksum  
200900213_15.pdf 8 MB PDF MD5 Open file

Dit eindwerk werd 5721 keer bekeken.
Translate to English (Google translate)
 

Show record details

Show ETD - Dublin Core

If you want to cite this thesis in your own thesis, paper, or report, use this format (APA):

Leenders, T. (2015). Uitvoeren risicoanalyse op elektrische installatie bij Mecam. Unpublished thesis, Hogeschool PXL, PXL-Tech.